High voltage industrial installations - Design (A2112)
Duration |
---|
4 Days |
Who should attend? |
---|
Engineers and technicians involved in design, study, modifications and maintenance |
What will I learn from this course?
- Design a high voltage electrical installation
- Estimate the value of the short-circuit currents
- Select the electric equipment and cables
- Improve the dialogue with people operating on site
Topics
Steps of the design of an installation
- Standards according to the country: NFC 13-100 and NFC 13-200 (France), CIE (international), Electricity code of Quebec, etc…
- List of equipment
- Selection of the structure
- Flow line diagram
- Selection of the neutral systems: isolated neutral, earth neutral
Voltage and current transformers
Characteristics of the equipment
Characteristics of the sources
- Grids, transformers, groups
Selection of the electric cables
- Dimensioning criteria
Selection of the equipment
- Disconnectors, switches, contactors, fuses, circuit breakers
Reminders of the short circuit current estimation
- The source is a transformer
- The source is a generator group
Neutral systems in industrial grids
- Study of the “isolated neutral” and "neutral Earthing resistors" systems
Reminders of the industrial grids protection
- “phases” default protection plan
- Earth” default protection plan
Reminders of the protection of distribution transformers
Case study
- Design of one part of a plant: selection of the equipment, comparison of the different solutions
Learning path
Prerequisites | A2112 | Next step |
---|---|---|
A0201 2-years University technological diploma or completion | 40% Case Study 60% Theoretical | D2102 |
High voltage industrial installations - Design (A2112)
Duration |
---|
4 Days |
Who should attend? |
---|
Engineers and technicians involved in design, study, modifications and maintenance |
What will I learn from this course?
- Design a high voltage electrical installation
- Estimate the value of the short-circuit currents
- Select the electric equipment and cables
- Improve the dialogue with people operating on site
Topics
Steps of the design of an installation
- Standards according to the country: NFC 13-100 and NFC 13-200 (France), CIE (international), Electricity code of Quebec, etc…
- List of equipment
- Selection of the structure
- Flow line diagram
- Selection of the neutral systems: isolated neutral, earth neutral
Voltage and current transformers
Characteristics of the equipment
Characteristics of the sources
- Grids, transformers, groups
Selection of the electric cables
- Dimensioning criteria
Selection of the equipment
- Disconnectors, switches, contactors, fuses, circuit breakers
Reminders of the short circuit current estimation
- The source is a transformer
- The source is a generator group
Neutral systems in industrial grids
- Study of the “isolated neutral” and "neutral Earthing resistors" systems
Reminders of the industrial grids protection
- “phases” default protection plan
- Earth” default protection plan
Reminders of the protection of distribution transformers
Case study
- Design of one part of a plant: selection of the equipment, comparison of the different solutions
Learning path
Prerequisites | A2112 | Next step |
---|---|---|
A0201 2-years University technological diploma or completion | 40% Case Study 60% Theoretical | D2102 |