In 2017, GE Vernova was awarded, through its joint venture KAPES, the first phase of the East Power Converter (LCC) project to design and supply equipment for a 220 km energy corridor from Donghaean on the East coast, to Shingapyeong near Seoul metropolitan area. The 4 GW power capacity HVDC link will be configured as a bi-pole, with a rating of ±500 kVDC. File Reference PEA-1664 Publish Date Tue, 11/04/2025 - 12:00 Resource File Size 1.94 MB Resource Category HVDC Resource PDF File East-Power-Phase-1-Case-Study-EN-N50654-Hybrid-202507-R002.pdf Resource Type 13 Resource Type Name White Papers/Case Studies Resource Passport Required On Resource Type White Papers/Case Studies InduStry Id List 2,3,4