25-Year Operations & Maintenance
Customer Challenge
Responsible for the operation and maintenance of one of the largest combined cycle power plants in the country, the customer needed to ensure a reliable evacuation of the power produced. Thus, it is critical for the operator to effectively operate and maintain the HV equipment, maximizing the availability of the 230 kV substation.
GE Vernova's Solution
A 25-year agreement to operate and maintain the evacuation substation equipped with 200+ third party OEM switchgears and the interconnection with the plant, including:
- Planned inspection and maintenance programs
- Unplanned maintenance
- A fully dedicated GE Vernova O&M site manager and operational team on site 365 day/year
- GridBeats™ APM application deployed to gather and analyze asset health data
- GridBeats™ APM training
Customer Benefits
- Substation availability warranted by contract
- The asset performance strategy is optimized
- One supplier operates and maintains the combined cycle power plant, the interconnection equipment and the evacuation substation